[Hotwork] New Hot Work Permit Request - Construction
Gavin Ketcheside
gavin.ketcheside at ucr.edu
Tue Mar 26 06:34:38 PDT 2024
From: Hot Work Program <noreply at qemailserver.com>
Sent: Monday, March 25, 2024 7:40 PM
To: Gavin Ketcheside <gavin.ketcheside at ucr.edu>
Subject: New Hot Work Permit Request - Construction
[Graphic.php?IM=IM_8HvGTwJPt7awyvX]
HOT WORK PERMIT REQUEST
CONSTRUCTION AND LARGE RENOVATION PROJECTS
-----------------------------------------------------------------------------------------------------
UCR PROJECT MANAGER: TAMEESHA D. HAYES
PHONE: 951.500.9413
EMAIL: tameesha.hayes at ucr.edu<mailto:tameesha.hayes at ucr.edu>
PERMIT REQUESTED BY: sam William
DEPARTMENT/CONTRACTOR COMPANY: Cornerstone Renovation, INC
PHONE NUMBER: (626) 705 -5396
EMAIL: sam at csrinc1.com<mailto:sam at csrinc1.com>
-----------------------------------------------------------------------------------------------------------------------------
JOB DETAILS
JOB START DATE: 03/28/2024
JOB END DATE: 04/15/2024
LOCATION - BUILDING/FLOOR/ROOM: ground level
THE FOLLOWING PRECAUTIONS HAVE BEEN ACKNOWLEDGED AND WILL BE IN PLACE WHENEVER POSSIBLE (FOR EXCEPTIONS - SEE COMMENTS BELOW)
General:
Available sprinklers, hose streams, and fire extinguishers are in service and operable
, Hot work equipment is in good repair
, Fire detection equipment protected from false activation
, PPE is used to protect workers from physical and chemical hazards while hot work is being performed
Within 35 feet (11 meters) of work:
Flammable liquids, dust, lint, and oily deposits are removed/cleaned
, Explosive atmosphere in area is eliminated
, Floors are swept and clean
, Combustible floors are wet down and/or covered with fire protection blankets
, Other combustibles are removed when possible or else covered with fire protection blankets or metal shields
, All wall and floor openings are covered
, Fire protection blankets are suspended beneath work
, Ducts and conveyors that might carry sparks to distant combustible materials are protected or shut down
Fire Watch/Hot Work area monitoring:
Fire watch will be provided during and for at least 30 minutes after work stops
(including lunch and break times)
, Fire watch is supplied with suitable fire extinguishers and fire fighting equipment
, Fire watch is trained in the use of fire extinguishing equipment and in sounding emergency alarm
, Additional fire watch may be required in adjoining areas, above, and/or below
, Fire watch will verify isolated fire detection equipment is returned to normal operation
Work on walls, ceilings and/or roofs:
Construction is non-combustible and without combustible covering or insulation
, Combustibles on both sides of walls, ceilings, and roofs are moved away
Work on enclosed equipment:
Does not apply
OTHER PRECAUTION(S) TAKEN (IF APPLICABLE):
a welding procedure has been submitted
COMMENTS (WHY PRECAUTION(S) CANNOT BE PUT INTO PLACE):
End of Request
-----------------------------------------------------------------------------------------------------------------------------
FIRE SAFETY APPROVAL
------------------------------------------------------------------------------------------------------
FIRE SAFETY APPROVAL: Gavin Ketcheside
PERMIT START (DATE): 3/28/24
PERMIT EXPIRES (DATE): 4/15/24
APPROVAL SENT TO REQUESTOR (DATE): 3/26/24
COMMENTS: Post permit in job trailer and/or job site for duration of permit. When work is completed,
Send work completion notice email below.
------------------------------------------------------------------------------------------------------
Send Work Completion Notice to hotwork at lists.ucr.edu<mailto:hotwork at lists.ucr.edu>
------------------------------------------------------------------------------------------------------
Select reply and complete the below information before sending.
JOB COMPLETED ON (Please specify DATE and TIME):
SUBMITTED BACK TO EH&S (DATE):
SUBMITTED BY:
________________________________
Recipient Data:
Time Finished: 2024-03-25 20:39:38 MDT
IP: 137.25.176.150
ResponseID: R_1lRHjDr5eFVWZSw
Link to View Results: Click Here<https://ucriverside.sjc1.qualtrics.com/apps/single-response-reports/reports/Nx6XHl14frgR2DO56Q7PUwc2TlZxs5Zmmkn0%2EWW-xVBI4byXXi9tGSYDBEshY6klEdDIsa%2EHCv0klxFSjoy7j82qA1RFsrpZLslzIz8n81LCSibNtbLVFYP-R41xkDmWaZWGyGr%2ERyOMoOcGXse%2EiPxICYMf2EjqIEqk2k13nkY4OqnqbAb9-JPfRDOEKTOeqkns8bz1hRDBwUal9FTi-razqbI2E3DN9Ydx1s-dVYzLaYQuypK5u6GfE6xjY4nGz1VmNHhu2n1Rr7Sb1TM%2EIWXCqEnKeJ9N97Sferwgj2aQGzc%2EGrkSatV8-KmF7FgZN-ov6%2EBrbGhBFqfLrBKtcw>
URL to View Results: https://ucriverside.sjc1.qualtrics.com/apps/single-response-reports/reports/Nx6XHl14frgR2DO56Q7PUwc2TlZxs5Zmmkn0%2EWW-xVBI4byXXi9tGSYDBEshY6klEdDIsa%2EHCv0klxFSjoy7j82qA1RFsrpZLslzIz8n81LCSibNtbLVFYP-R41xkDmWaZWGyGr%2ERyOMoOcGXse%2EiPxICYMf2EjqIEqk2k13nkY4OqnqbAb9-JPfRDOEKTOeqkns8bz1hRDBwUal9FTi-razqbI2E3DN9Ydx1s-dVYzLaYQuypK5u6GfE6xjY4nGz1VmNHhu2n1Rr7Sb1TM%2EIWXCqEnKeJ9N97Sferwgj2aQGzc%2EGrkSatV8-KmF7FgZN-ov6%2EBrbGhBFqfLrBKtcw
________________________________
Response Summary:
PLEASE SELECT PERMIT TYPE:
Construction and large renovation Projects (PD&C managed)
PRECAUTIONS CHECKLIST: Note: If necessary, please use the comments area below to further explain why a listed precaution cannot be taken in the manner described.
Available sprinklers, hose streams, and fire extinguishers are in service and operable
Hot work equipment is in good repair
Fire detection equipment protected from false activation
PPE is used to protect workers from physical and chemical hazards while hot work is being performed
WITHIN 35 FEET (11 METERS) OF HOT WORK SITE:
Flammable liquids, dust, lint, and oily deposits are removed/cleaned
Explosive atmosphere in area is eliminated
Floors are swept and clean
Combustible floors are wet down and/or covered with fire protection blankets
Other combustibles are removed when possible or else covered with fire protection blankets or metal shields
All wall and floor openings are covered
Fire protection blankets are suspended beneath work
Ducts and conveyors that might carry sparks to distant combustible materials are protected or shut down
FIRE WATCH/HOT WORK AREA MONITORING:
Fire watch will be provided during and for at least 30 minutes after work stops (including lunch and break times)
Fire watch is supplied with suitable fire extinguishers and fire fighting equipment
Fire watch is trained in the use of fire extinguishing equipment and in sounding emergency alarm
Additional fire watch may be required in adjoining areas, above, and/or below
Fire watch will verify isolated fire detection equipment is returned to normal operation
WORK ON WALLS, CEILINGS, AND/OR ROOFS:
Construction is non-combustible and without combustible covering or insulation
Combustibles on both sides of walls, ceilings, and roofs are moved away
WORK ON ENCLOSED EQUIPMENT:
Does not apply
OTHER PRECAUTIONS TAKEN:
a welding procedure has been submitted
HOT WORK BEING PERFORMED BY:
Contractor under Planning Design & Construction supervision (large construction projects)
JOB TIME FRAME:
Start date 03/28/2024
Start Time 7:00 AM
End Date 04/15/2024
End time 11:00 AM
LOCATION OF HOT WORK (BUILDING, FLOOR, ROOM, ETC.)
ground level
Project/WO Number:
950590
FACILITIES SUPERVISOR OR UCR PROJECT MANAGER SUPERVISING THIS JOB:
Name TAMEESHA D. HAYES
Phone Number 951.500.9413
Email tameesha.hayes at ucr.edu<mailto:tameesha.hayes at ucr.edu>
HOT WORK PERMIT REQUESTOR:
Name sam William
Department/Contractor Company Cornerstone Renovation, INC
Phone Number (626) 705 -5396
Email Address sam at csrinc1.com<mailto:sam at csrinc1.com>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://lists.ucr.edu/pipermail/hotwork/attachments/20240326/e9d78f38/attachment-0001.html>
More information about the Hotwork
mailing list