[Hotwork] New Hot Work Permit Request - Construction
Gavin Ketcheside
gavin.ketcheside at ucr.edu
Fri Aug 6 08:55:22 PDT 2021
From: Hot Work Program <noreply at qemailserver.com>
Sent: Friday, August 6, 2021 4:55 AM
To: Gavin Ketcheside <gavin.ketcheside at ucr.edu>
Subject: New Hot Work Permit Request - Construction
[Graphic.php?IM=IM_8HvGTwJPt7awyvX]
HOT WORK PERMIT REQUEST
CONSTRUCTION AND LARGE RENOVATION PROJECTS
-----------------------------------------------------------------------------------------------------
UCR PROJECT MANAGER: Mihai Gavan
PHONE: (951) 660-7453
EMAIL: mihai.gavan at ucr.edu<mailto:mihai.gavan at ucr.edu>
PERMIT REQUESTED BY: Sean Williams
DEPARTMENT/CONTRACTOR COMPANY: Hensel Phelps Construction Company
PHONE NUMBER: 310-433-1137
EMAIL: swilliams at henselphelps.com<mailto:swilliams at henselphelps.com>
-----------------------------------------------------------------------------------------------------------------------------
JOB DETAILS
JOB START DATE: 07/22/2021
JOB END DATE: 06/09/2023
LOCATION - BUILDING/FLOOR/ROOM: Green Houses 6-10 and for the New Construction of the School of Medicine ED Building II
THE FOLLOWING PRECAUTIONS HAVE BEEN ACKNOWLEDGED AND WILL BE IN PLACE WHENEVER POSSIBLE (FOR EXCEPTIONS - SEE COMMENTS BELOW)
General:
Available sprinklers, hose streams, and fire extinguishers are in service and operable
, Hot work equipment is in good repair
, Fire detection equipment protected from false activation
, PPE is used to protect workers from physical and chemical hazards while hot work is being performed
Within 35 feet (11 meters) of work:
Flammable liquids, dust, lint, and oily deposits are removed/cleaned
, Explosive atmosphere in area is eliminated
, Floors are swept and clean
, Combustible floors are wet down and/or covered with fire protection blankets
, Other combustibles are removed when possible or else covered with fire protection blankets or metal shields
, All wall and floor openings are covered
, Fire protection blankets are suspended beneath work
, Ducts and conveyors that might carry sparks to distant combustible materials are protected or shut down
Fire Watch/Hot Work area monitoring:
Fire watch will be provided during and for at least 30 minutes after work stops
(including lunch and break times)
, Fire watch is supplied with suitable fire extinguishers and fire fighting equipment
, Fire watch is trained in the use of fire extinguishing equipment and in sounding emergency alarm
, Additional fire watch may be required in adjoining areas, above, and/or below
, Fire watch will verify isolated fire detection equipment is returned to normal operation
Work on walls, ceilings and/or roofs:
Construction is non-combustible and without combustible covering or insulation
, Combustibles on both sides of walls, ceilings, and roofs are moved away
Work on enclosed equipment:
, Enclosed equipment is cleaned of all combustibles
, Containers have been purged of flammable liquids and vapors
, Pressurized vessels, piping, and other equipment removed from service, isolated, and vented
OTHER PRECAUTION(S) TAKEN (IF APPLICABLE):
We Have fire blankets, firewatch, Fire extinguishers and our own in house Hot Work Permits that are required and documented prior to the start of work.
COMMENTS (WHY PRECAUTION(S) CANNOT BE PUT INTO PLACE):
End of Request
-----------------------------------------------------------------------------------------------------------------------------
FIRE SAFETY APPROVAL
------------------------------------------------------------------------------------------------------
FIRE SAFETY APPROVAL: Gavin Ketcheside DCFM
PERMIT START (DATE): 07/22/2021
PERMIT EXPIRES (DATE): 06/09/2023
APPROVAL SENT TO REQUESTOR (DATE): 8/6/2021
COMMENTS: Please post copy of this approved hot works permit in job trailer through duration of project.
------------------------------------------------------------------------------------------------------
Send Work Completion Notice to hotwork at lists.ucr.edu<mailto:hotwork at lists.ucr.edu>
------------------------------------------------------------------------------------------------------
Select reply and complete the below information before sending.
JOB COMPLETED ON (Please specify DATE and TIME):
SUBMITTED BACK TO EH&S (DATE):
SUBMITTED BY:
________________________________
Recipient Data:
Time Finished: 2021-08-06 05:55:26 MDT
IP: 174.243.209.99
ResponseID: R_efGJpkTFryPOIpj
Link to View Results: Click Here<https://ucriverside.az1.qualtrics.com/CP/Report.php?SID=SV_ePfBAW2lq6Aze8R&R=R_efGJpkTFryPOIpj>
URL to View Results: https://ucriverside.az1.qualtrics.com/CP/Report.php?SID=SV_ePfBAW2lq6Aze8R&R=R_efGJpkTFryPOIpj
________________________________
Response Summary:
PLEASE SELECT PERMIT TYPE:
Construction and large renovation Projects (PD&C managed)
PRECAUTIONS CHECKLIST:Note: If necessary, please use the comments area below to further explain why a listed precaution cannot be taken in the manner described.
Available sprinklers, hose streams, and fire extinguishers are in service and operable
Hot work equipment is in good repair
Fire detection equipment protected from false activation
PPE is used to protect workers from physical and chemical hazards while hot work is being performed
WITHIN 35 FEET (11 METERS) OF HOT WORK SITE:
Flammable liquids, dust, lint, and oily deposits are removed/cleaned
Explosive atmosphere in area is eliminated
Floors are swept and clean
Combustible floors are wet down and/or covered with fire protection blankets
Other combustibles are removed when possible or else covered with fire protection blankets or metal shields
All wall and floor openings are covered
Fire protection blankets are suspended beneath work
Ducts and conveyors that might carry sparks to distant combustible materials are protected or shut down
FIRE WATCH/HOT WORK AREA MONITORING:
Fire watch will be provided during and for at least 30 minutes after work stops (including lunch and break times)
Fire watch is supplied with suitable fire extinguishers and fire fighting equipment
Fire watch is trained in the use of fire extinguishing equipment and in sounding emergency alarm
Additional fire watch may be required in adjoining areas, above, and/or below
Fire watch will verify isolated fire detection equipment is returned to normal operation
WORK ON WALLS, CEILINGS, AND/OR ROOFS:
Construction is non-combustible and without combustible covering or insulation
Combustibles on both sides of walls, ceilings, and roofs are moved away
WORK ON ENCLOSED EQUIPMENT:
, Enclosed equipment is cleaned of all combustibles
Containers have been purged of flammable liquids and vapors
Pressurized vessels, piping, and other equipment removed from service, isolated, and vented
OTHER PRECAUTIONS TAKEN:
We Have fire blankets, firewatch, Fire extinguishers and our own in house Hot Work Permits that are required and documented prior to the start of work.
HOT WORK BEING PERFORMED BY:
Contractor under Planning Design & Construction supervision (large construction projects)
JOB TIME FRAME:
Start date 07/22/2021
Start Time 5:51 AM
End Date 06/09/2023
End time 11:59 PM
LOCATION OF HOT WORK (BUILDING, FLOOR, ROOM, ETC.)
Green Houses 6-10 and for the New Construction of the School of Medicine ED Building II
Project/WO Number:
954045
FACILITIES SUPERVISOR OR UCR PROJECT MANAGER SUPERVISING THIS JOB:
Name Mihai Gavan
Phone Number (951) 660-7453
Email mihai.gavan at ucr.edu<mailto:mihai.gavan at ucr.edu>
HOT WORK PERMIT REQUESTOR:
Name Sean Williams
Department/Contractor Company Hensel Phelps Construction Company
Phone Number 310-433-1137
Email Address swilliams at henselphelps.com<mailto:swilliams at henselphelps.com>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://lists.ucr.edu/pipermail/hotwork/attachments/20210806/8327d22f/attachment-0001.html>
More information about the Hotwork
mailing list