PENDING SHUTDOWN NOTIFICATION
[Text  Description automatically generated]
DATE
02/17/2021
FROM
Facilities Services
TO
Impacted Building Occupants
SUBJECT
Updated Date: Pending Multiple Building Power Shutdown for Saturday 02-27-21
Please be advised:

In an effort to integrate new power switches into existing electrical circuits, it will be necessary to perform electrical work on the campus high voltage system in the project area on Saturday, February 27, 2021 at 12:00 a.m. (midnight) - 5:00 a.m. This work will require the following:


  *   The original proposed shutdown date of 02/20/21 has been updated to Saturday, February 27, 2021 and was selected due to the scope and safety considerations required for this work, as it is preferred to be performed during a time period when power usage is at its lowest and campus business operations are closed.
  *   Multiple buildings (listed below) to experience two service interruptions lasting less than 90 minutes in duration.
  *   Additional buildings (listed below) to experience one service interruptions lasting less than 5 minutes in duration.
  *   It is our goal to limit interruptions related to this electrical project. Facilities Services staff will be onsite to ensure all power returns to normal.

POWER INTERRUPTIONS
The following buildings will experience TWO service interruptions lasting up to a half hour (30 minutes) in duration.
·        The first service interruption will occur during the transition to generator power and the second interruption transferring service from generator power back to main power.
·        A generator will be located at the project worksite to provide backup power to the main electrical circuits that supply these buildings during the service interruption.

Impacted Buildings
Anthropology Trailer
Growth Trailer
Batchelor Hall
Keen Hall
Botanical Gardens
Life Sciences Building
Boyden Laboratory
Psychology Building
College Building North
Satellite Chiller Plant
Entomology Building
Stored Products Insecticide (SPI) Building
Facilities Annex A & B
Spieth Hall,  Herbarium
Fawcett Lab
Superintendents Cottage
Green Houses 1-3, 18-21, 51-52 and Trailer #7
University Office Building


The following buildings will experience ONE service outage lasting up to one and a half hours (1.5 hours) in duration.

  *   Buildings with back-up generators will support fire and life safety systems and E-power circuits only.

Impacted Buildings
Anderson Hall
Entomology Museum
Biological Sciences
Genomics
Central Plant
Insectary & Quarantine
Chapman Hall
School of Medicine Building Research
Computing & Communications Building


Concerned occupants should take the following precautions prior to February 27, 2021:

·        If you have sensitive research equipment or systems you know can be impacted by power interruption and you have not connected them to uninterrupted power devices (UPS) and surge protectors, please plan to disconnect and turn off equipment for the duration of the day to avoid any damage.
·        Additional information on how to power down your lab may be found from our partners at EH&S: https://ehs.ucr.edu/laboratory/utilities.


CONTACT
John Franklin, PD&C Project Manager
john.franklin at ucr.edu<mailto:john.franklin at ucr.edu>

Kirk Quash, Electrical Supervisor
Kirk.quash at ucr.edu<mailto:Kirk.quash at ucr.edu>

Christopher Pillen, Assistant Director of Maintenance Services
christopher.pillen at ucr.edu<mailto:christopher.pillen at ucr.edu>

Customer Relations Team
(951) 827-4214 / facilities at ucr.edu<mailto:facilities at ucr.edu>

In an ongoing effort to keep our distribution lists accurate and updated, if someone needs to be included or removed on this type of notification, please use this form<https://ucriverside.az1.qualtrics.com/jfe/form/SV_cTo6oGTfyfT6h13> to add their contact information. If you have any questions or concerns, please email facilities at ucr.edu<mailto:facilities at ucr.edu>

Thank you,
Facilities Services


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://lists.ucr.edu/pipermail/facilities-notifications/attachments/20210218/63d07e30/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.png
Type: image/png
Size: 4149 bytes
Desc: image001.png
URL: <https://lists.ucr.edu/pipermail/facilities-notifications/attachments/20210218/63d07e30/attachment-0001.png>


More information about the Facilities-Notifications mailing list