[Corebotanyfaculty] FW: 950464 Batchelor Hall - Construction Update

April Meinzer april.meinzer at ucr.edu
Mon Apr 24 12:04:02 PDT 2023


ALL BATCHELOR HALL OCCUPANTS AND DEPARTMENT LEADERSHIP,



Please be advised that the following activities will be occurring at the Batchelor Hall Building for the week of April 24, 2023 through April 28, 2023.



            Site, Roof and Basement:

·         Research and Identification of Mechanical, Electrical and Plumbing Piping.

·         Demo Concrete Deck at Roof.  Expect Vibration and Noise.

·         HHW in Basement.  Expect Welding Odor.

·         Chilled Water Piping Install.

·         Installation of Electrical Panels and Conduit Runs. Expect Drilling Noise.



Area A (Main Building):

·            Install Anchors for Conduit Runs in Basement. Expect Drilling Noise.

·            Install Plumbing Piping in Basement.  Expect Welding Odor.



Phase II:

·            Coring Concrete for Mechanical Piping Systems.  Expect Drilling Noise.

·            Demo of Concrete at Roof.  Expect Noise and Odor from the Cutting of Concrete.

·            Stripping of Roof Deck Material.

·            Welding of Duct Work to Fume Hoods in Labs.  Expect Welding Odor.

·            Installing Duct Work in Mechanical Chase.  Expect Welding Odor.

·            Concrete Deck Preparation at 4th Floor Lobby.  Expect Drilling and Hammering Noise.

·            Install Fire Alarm.

·            Install Fire Sprinklers.



Area B (South Building):

·            Duct work, Electrical and Painting in Room 2211A.  Expect Paint and Welding Odor.

·            Replacement of Existing Fire Dampers.

·            Phase I Punch Walks and Repairs.


If you have any questions or concerns please feel free to email me or John Franklin (john.franklin at ucr.edu<mailto:john.franklin at ucr.edu> or call 951-203-7910).

The UCR Batchelor Hall Team recognizes that construction activities will at times pose inconveniences and disruption to the building occupants. We thank you for your patience during the construction of this project.


Vilma C. Kern, CCM, CPM
PROJECT MANAGER

[cid:image001.png at 01D974F3.64B18210]

UNIVERSITY OF CALIFORNIA, RIVERSIDE
1223 UNIVERSITY | AVE SUITE 240 | RIVERSIDE CA 92507
P: 951-827-2464 | C: 951-534-2203 | vilma.kern at ucr.edu<mailto:vilma.kern at ucr.edu>

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://lists.ucr.edu/pipermail/corebotanyfaculty/attachments/20230424/41b8d9aa/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.png
Type: image/png
Size: 3103 bytes
Desc: image001.png
URL: <https://lists.ucr.edu/pipermail/corebotanyfaculty/attachments/20230424/41b8d9aa/attachment-0001.png>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: 950464 ConstructionUpdate_2023-04-21.pdf
Type: application/pdf
Size: 181483 bytes
Desc: 950464 ConstructionUpdate_2023-04-21.pdf
URL: <https://lists.ucr.edu/pipermail/corebotanyfaculty/attachments/20230424/41b8d9aa/attachment-0001.pdf>


More information about the Corebotanyfaculty mailing list