[Physics-staff] FW: 950601 Physics Roof Project - Construction Notice for Week of 7/15/24
Guille Vallejo
guille.vallejo at ucr.edu
Fri Jul 12 11:45:25 PDT 2024
FYI to keep you updated as to the progress of our roof renovation. Thanks
Guille Vallejo
From: Fernando Nunez <fernando.nunez at ucr.edu>
Sent: Friday, July 12, 2024 11:34 AM
To: Shan-Wen Tsai <shan-wen.tsai at ucr.edu>; Guille Vallejo <guille.vallejo at ucr.edu>; Robert N Sanderson <robert.sanderson at ucr.edu>
Cc: Sabrina A Schuster <sabrina.schuster at ucr.edu>; Betty Osuna <ibeth.osuna at ucr.edu>
Subject: RE: 950601 Physics Roof Project - Construction Notice for Week of 7/15/24
Hello Team,
Please see below for the planned construction activities taking place the week of 7/15/2024:
2-Story Wing:
1. Roof Demo: Will continue through week of 7/15.
2. Roof Install: Will continue through week of 7/15.
3. Fireproofing: Patchwork tentatively scheduled for week of 7/15
4. Encapsulation: tentatively scheduled for week of 7/15.
3-Story Wing:
1. Interior Containment: Scheduled to be completed week of 7/15.
2. Roof Abatement: Scheduled to commence week 7/15.
3. Elevator: Public elevator access to 3rd floor continues to be disabled.
Building Misc.:
1. Loading Dock Laydown Area: Heavy activity due to multiple crews on site including removal of debris containers and loading of material onto roof.
I ask that you please review and distribute to the occupants as needed. Feel free to reach out if you have any questions.
Thanks,
Fernando Nuñez Jr.
Project Manager
UNIVERSITY OF CALIFORNIA, RIVERSIDE
3401 WATKINS AVE. | ANNEX A | RIVERSIDE CA 92521
M:951.312.5749 fernando.nunez at ucr.edu <mailto:fernando.nunez at ucr.edu%20>
[cid:image001.png at 01DAD44C.D157DBD0]
From: Fernando Nunez <fernando.nunez at ucr.edu<mailto:fernando.nunez at ucr.edu>>
Sent: Friday, July 5, 2024 10:17 AM
To: Shan-Wen Tsai <shan-wen.tsai at ucr.edu<mailto:shan-wen.tsai at ucr.edu>>; Guille Vallejo <guille.vallejo at ucr.edu<mailto:guille.vallejo at ucr.edu>>; Robert N Sanderson <robert.sanderson at ucr.edu<mailto:robert.sanderson at ucr.edu>>
Cc: Sabrina A Schuster <sabrina.schuster at ucr.edu<mailto:sabrina.schuster at ucr.edu>>; Betty Osuna <ibeth.osuna at ucr.edu<mailto:ibeth.osuna at ucr.edu>>
Subject: RE: 950601 Physics Roof Project - Construction Notice for Week of 7/8/24
Hello Team,
Please see below for the planned construction activities taking place the week of 7/8/2024:
2-Story Wing:
1. Roof Abatement: Completed with clearances received 7/1.
2. Interior Containment: Completed with clearances received 7/1.
3. Roof Demo: Scheduled to continue through week of 7/8.
4. Roof Install: Commenced week of 7/1 and will continue into week of 7/8.
3-Story Wing:
1. Interior Containment: To be completed week of 7/8.
2. Roof Abatement: Scheduled to commence week of 7/8.
3. Elevator: Public elevator access to 3rd floor continues to be disabled.
Building Misc.:
1. Loading Dock Laydown Area: Heavy activity due to multiple crews on site including removal of debris containers and loading of material onto roof.
I ask that you please review and distribute to the occupants as needed. Feel free to reach out if you have any questions.
Thanks,
Fernando Nuñez Jr.
Project Manager
UNIVERSITY OF CALIFORNIA, RIVERSIDE
3401 WATKINS AVE. | ANNEX A | RIVERSIDE CA 92521
M:951.312.5749 fernando.nunez at ucr.edu <mailto:fernando.nunez at ucr.edu%20>
[cid:image001.png at 01DAD44C.D157DBD0]
From: Fernando Nunez <fernando.nunez at ucr.edu<mailto:fernando.nunez at ucr.edu>>
Sent: Friday, June 28, 2024 10:07 AM
To: Shan-Wen Tsai <shan-wen.tsai at ucr.edu<mailto:shan-wen.tsai at ucr.edu>>; Guille Vallejo <guille.vallejo at ucr.edu<mailto:guille.vallejo at ucr.edu>>; Robert N Sanderson <robert.sanderson at ucr.edu<mailto:robert.sanderson at ucr.edu>>
Cc: Sabrina A Schuster <sabrina.schuster at ucr.edu<mailto:sabrina.schuster at ucr.edu>>; Betty Osuna <ibeth.osuna at ucr.edu<mailto:ibeth.osuna at ucr.edu>>
Subject: 950601 Physics Roof Project - Construction Notice for Week of 7/1/24
Hello Team,
Please see below for the planned construction activities taking place the week of 7/1/2024:
2-Story Wing:
1. Roof Abatement: To continue for the week of 7/1. ACM clearances are expected to be received during the upcoming week confirming that all ACM has been removed from the roof.
2. Interior Containment: Interior containment is complete with ACM clearances expected to be received during the upcoming week confirming that containment is ready for demo activities.
3. Roof Demo: Scheduled to begin mid-week if ACM clearances for abatement and containment are received.
3-Story Wing:
1. Interior Containment: Commenced on 6/27 and will continue for the week of 7/1. AC has been turned off with all entrances to the 3rd floor closed off.
2. Elevator: Public elevator access to 3rd floor has been disabled.
Building Misc.:
1. Loading Dock Laydown Area: Temp. fencing has been erected with roofing material in place ready to be loaded on roof.
I ask that you please review and distribute to the occupants as needed. Feel free to reach out if you have any questions.
Thanks,
Fernando Nuñez Jr.
Project Manager
UNIVERSITY OF CALIFORNIA, RIVERSIDE
3401 WATKINS AVE. | ANNEX A | RIVERSIDE CA 92521
M:951.312.5749 fernando.nunez at ucr.edu <mailto:fernando.nunez at ucr.edu%20>
[cid:image001.png at 01DAD44C.D157DBD0]
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://lists.ucr.edu/pipermail/physics-staff/attachments/20240712/288acae6/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.png
Type: image/png
Size: 14232 bytes
Desc: image001.png
URL: <https://lists.ucr.edu/pipermail/physics-staff/attachments/20240712/288acae6/attachment-0001.png>
More information about the Physics-staff
mailing list