[Hotwork] New Hot Work Permit Request - Construction
Gavin Ketcheside
gavin.ketcheside at ucr.edu
Mon Jun 1 19:26:19 PDT 2020
From: Hot Work Program <noreply at qemailserver.com>
Sent: Monday, June 1, 2020 12:07 PM
To: Gavin Ketcheside <gavin.ketcheside at ucr.edu>
Subject: New Hot Work Permit Request - Construction
[Graphic.php?IM=IM_8HvGTwJPt7awyvX]
HOT WORK PERMIT REQUEST
CONSTRUCTION AND LARGE RENOVATION PROJECTS
-----------------------------------------------------------------------------------------------------
UCR PROJECT MANAGER: Fernando Canon
PHONE: 951-827-4821
EMAIL: fernando.canon at ucr.edu<mailto:fernando.canon at ucr.edu>
PERMIT REQUESTED BY: David Evans
DEPARTMENT/CONTRACTOR COMPANY: Kitchell Contractors
PHONE NUMBER: 619-372-6964
EMAIL: deevans at kitchell.com<mailto:deevans at kitchell.com>
-----------------------------------------------------------------------------------------------------------------------------
JOB DETAILS
JOB START DATE: 06/02/2020
JOB END DATE: 06/03/2020
LOCATION - BUILDING/FLOOR/ROOM: Orbach Library Ground Floor Lobby
THE FOLLOWING PRECAUTIONS HAVE BEEN ACKNOWLEDGED AND WILL BE IN PLACE WHENEVER POSSIBLE (FOR EXCEPTIONS - SEE COMMENTS BELOW)
General:
, Available sprinklers, hose streams, and fire extinguishers are in service and operable
, Hot work equipment is in good repair
, Fire detection equipment protected from false activation
, PPE is used to protect workers from physical and chemical hazards while hot work is being performed
Within 35 feet (11 meters) of work:
, Flammable liquids, dust, lint, and oily deposits are removed/cleaned
, Explosive atmosphere in area is eliminated
, Floors are swept and clean
, Combustible floors are wet down and/or covered with fire protection blankets
, Other combustibles are removed when possible or else covered with fire protection blankets or metal shields
, All wall and floor openings are covered
, Fire protection blankets are suspended beneath work
, Ducts and conveyors that might carry sparks to distant combustible materials are protected or shut down
Fire Watch/Hot Work area monitoring:
, Fire watch will be provided during and for at least 30 minutes after work stops
(including lunch and break times)
, Fire watch is supplied with suitable fire extinguishers and fire fighting equipment
, Fire watch is trained in the use of fire extinguishing equipment and in sounding emergency alarm
, Additional fire watch may be required in adjoining areas, above, and/or below
, Fire watch will verify isolated fire detection equipment is returned to normal operation
Work on walls, ceilings and/or roofs:
Does not apply
Work on enclosed equipment:
Does not apply
OTHER PRECAUTION(S) TAKEN (IF APPLICABLE):
COMMENTS (WHY PRECAUTION(S) CANNOT BE PUT INTO PLACE):
End of Request
-----------------------------------------------------------------------------------------------------------------------------
FIRE SAFETY APPROVAL
------------------------------------------------------------------------------------------------------
FIRE SAFETY APPROVAL: Gavin Ketcheside Assistant Fire Marshal
PERMIT START (DATE): 6/2/20
PERMIT EXPIRES (DATE): 6/3/20
APPROVAL SENT TO REQUESTOR (DATE): 6/1/20
COMMENTS: Any questions call Gavin K at 951-333-9289
------------------------------------------------------------------------------------------------------
Send Work Completion Notice to hotwork at lists.ucr.edu<mailto:hotwork at lists.ucr.edu>
------------------------------------------------------------------------------------------------------
Select reply and complete the below information before sending.
JOB COMPLETED ON (Please specify DATE and TIME):
SUBMITTED BACK TO EH&S (DATE):
SUBMITTED BY:
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://lists.ucr.edu/pipermail/hotwork/attachments/20200602/88223390/attachment.html>
More information about the Hotwork
mailing list